Dec. 13th Workday
we got rained out saturday so we have rescheduled the work day.
Come join the fun at 9:00 a.m. this Sunday Dec. 13th.
We have a load of dirt to use so we should get some stuff done. on the agenda is
1) adding a new section to the retaining wall on hole 12
2) Try to repair the tree on hole 5
3) some light trimming to hole 8 and 9's fairway's (if we have time/people)
we will need some tools for sure.
1) Wheelbarrows
2) shovels
3) a ladder
4) Posthole digger
5) brute strength / ignorance
we will build a new section of wall as well as backfilling the new and existing sections on hole 12 and that is the focal point of the work day. so if we can get some people out we should be able to knock some stuff out.
Last edited by bgwvdave; Dec 07 2009 at 07:26 PM.
|