June 6th Workday
June 6th Workday 9:00 a.m. is when the fun begins
1) Hole 1 Tee pad project - build up the front of the teed pad to minimize the drop off at the front when following thru.
- we will be building a frame and filling it with silk screen then sand the crushed rock
2) unclog the bridge over number 6's fairway ditch
3)spray the bases of fairway trees to retard sucker growth in fairways as well as spray the poinson ivey growing down by the ditch on hole 8
4) take a look at schule on the left side of hold 9's fairway and TTrim if needed
|