Default Re: March 22nd Workday

Another GREAT workday by the N.H.D.C. thanks to Clay, Rudy, Moncropilis, Fig, Rory, Sjur and A-dubbs, for your contributions. the Front 9's fairways are as clean and fair as ever. if there are limbs in the fairway on the front it is becasue they are just to high for me to get to on a extension ladder with a pole saw.

Hole 9's rain ditch at the fairway now has a Sock towell drainage hose installed and has been covered with sand to basically conceal the ditch totally. hole 12's ditch has been cleaned and the retaining wall has been extended all the way to the steps. once again GREAT work to all that showed. i could not be prouder of the work that the club puts in time and time again. you guys are the best!!
__________________
www.newhanoverdgc.com

Nobody says Wooooooo around here except ME
bgwvdave is offline   Reply With Quote